2180161
Veteran
New possible method?
Hi. Im new to the forum, but i have sort of found an issue/method I use. I use to speedsolve (currently averaging around 20-25s) a method i havent seen a tutorial for. What I do is I solve the F2B like with Roux, And then do CMLL (I use 2 look) and then fix bad edges, but then finish the F2L, and it always brings me to an easy PLL. Those PLL's are all the edge cycle ones. Very rarely do I have a Z or H perm. If this is in the wrong place for this, please place in the right spot. Thank you
Hi. Im new to the forum, but i have sort of found an issue/method I use. I use to speedsolve (currently averaging around 20-25s) a method i havent seen a tutorial for. What I do is I solve the F2B like with Roux, And then do CMLL (I use 2 look) and then fix bad edges, but then finish the F2L, and it always brings me to an easy PLL. Those PLL's are all the edge cycle ones. Very rarely do I have a Z or H perm. If this is in the wrong place for this, please place in the right spot. Thank you
