• Welcome to the Speedsolving.com, home of the web's largest puzzle community!
    You are currently viewing our forum as a guest which gives you limited access to join discussions and access our other features.

    Registration is fast, simple and absolutely free so please, join our community of 35,000+ people from around the world today!

    If you are already a member, simply login to hide this message and begin participating in the community!

Change order of posts

pjk

Administrator
Staff member
Joined
Mar 13, 2006
Messages
6,410
WCA
2007KELL02
Within a thread? I don't recall that, would the first original post still be at the top, or when you clicked on a thread the newest post was at the top?
 

Cheese11

Member
Joined
Jul 18, 2011
Messages
1,074
Location
Winnipeg, Manitoba, Canada
WCA
2011KULC01
YouTube
EricKulchycki
Within a thread? I don't recall that, would the first original post still be at the top, or when you clicked on a thread the newest post was at the top?
I'm sure this was back in about 2014, but when I clicked a thread it would jump to the page with the newest posts. Very useful for the very old threads with hundreds of replies, and doesn't really hinder those with not many.
 

pjk

Administrator
Staff member
Joined
Mar 13, 2006
Messages
6,410
WCA
2007KELL02
I'm sure this was back in about 2014, but when I clicked a thread it would jump to the page with the newest posts. Very useful for the very old threads with hundreds of replies, and doesn't really hinder those with not many.
When you click on a thread, it should jump to the latest posts, namely, the first unread post in the thread. If you look at the links on the bold threads (threads with at least 1 unread post), the URL has /unread at the end. When clicking on it, it will take you to the first unread post. Is this correct and as expected? If I'm not mistaken, this is how it has worked since long before 2014.
 

Cheese11

Member
Joined
Jul 18, 2011
Messages
1,074
Location
Winnipeg, Manitoba, Canada
WCA
2011KULC01
YouTube
EricKulchycki
When you click on a thread, it should jump to the latest posts, namely, the first unread post in the thread. If you look at the links on the bold threads (threads with at least 1 unread post), the URL has /unread at the end. When clicking on it, it will take you to the first unread post. Is this correct and as expected? If I'm not mistaken, this is how it has worked since long before 2014.
It could be, and I could absolutely be miss-remembering. So I'll just deal with how it is! Thanks for the help!
 
Top